All work

Every open task across your projects as a timeline, list or board, with totals for the work left, how much is booked and how long the rest would take.

All work puts every open task from every project on one screen, and adds it up: how much work is left, how much of it already has time booked, and how many weeks of the team’s free time the rest would take.

Open All work under Workspace in the sidebar. Done tasks aren’t here. This is the work still to do.

Three views#

Switch with the buttons at the top right.

Timeline#

The default. Each project is a group on one shared day grid, with a bar spanning all its tasks and a row for each task underneath.

  • A solid bar is booked time, from the task’s first booked day to its last.
  • A hollow bar is planned, not booked: it’s drawn back from the task’s due date by its estimate, counting eight-hour working days, Monday to Friday.
  • No bar means the task has neither booked time nor a due date. It’s listed as “unscheduled”.
  • AI workers’ tasks and blocked tasks have their own colours, shown in the legend.
  • A wide bar shows the task’s key and a percentage: the share of the estimate whose booked time has already passed.
  • The vertical line is today.

Week, Day and Month change the zoom.

List#

Tasks grouped by project, soonest due date first, with the columns Key, Task, Outcome, Who, Status, Est, Left and Due. Left is the estimate less the time already worked. Each project’s heading gives its own totals: hours left, booked and still to schedule. Blocked tasks are tinted red.

Board#

One column for each open stage, with every project’s cards together: Backlog, Invited, Progress (tasks in progress and blocked tasks) and Review. Each card names its project.

All three views are read-only. Click a task to open it, or a project’s name to open the project. To move work, use the project’s own views or the Calendar.

Filters#

  • Projects opens a checklist. Tick as many projects as you like, or All projects for everything.
  • Team narrows to the work of one or more teams. If you’re in a team, All work opens on My teams; Show everyone in the line under the title widens it.
  • Person narrows to one person or AI worker. Nobody yet shows tasks with no assignee.
  • Status narrows to one stage: Backlog, Invited, In progress, Blocked or In review.
  • Clear filters resets Projects, Person and Status. The team stays as you chose it.

Every total follows the filters. The filters and the view are part of the page’s address, so you can share a link to exactly what you’re looking at.

The totals#

Four figures sit above the tasks. They’re shown in whole hours.

FigureWhat it tells you
Work remainingThe work left in the open tasks shown, and how many tasks that is.
BookedHow much of the remaining work already has time set aside for it, and that as a percentage.
Still to scheduleRemaining work with no time booked yet.
Team free time · 4 weeksThe team’s free working time over the next four weeks, and how many weeks of it the unscheduled work would take.

When more than one project has open work, a row for each project follows: a status bar, the hours remaining, the task count and how much is still to schedule. The bar splits the project’s open tasks into In progress (which includes tasks in review), Invited, Blocked and Backlog. Hover over a colour to see its count. Done tasks aren’t on this page, so the bar has no Done part.

How the figures are worked out#

Work remaining. For each task, its estimate less the time already worked on it, never below zero. Time already worked is the task’s booked time that is now in the past. A task with no estimate adds nothing. The figure says how many tasks are “without an estimate”, so you know the total is missing some work.

Booked. For each task, its booked time that is still ahead, up to the task’s remaining work. Booking more than a task needs doesn’t push the figure past the work remaining.

Still to schedule. Work remaining less booked. Booked and still to schedule always add up to work remaining.

Team free time. For each active person, their working hours from now through the next 28 days, less everything already booked for them in any project. AI workers aren’t counted, because their time is machine time and not hours a person has free.

Weeks of free time. The line under the last figure reads, for example, “≈ 3.5 weeks of free time to book what’s left”. It divides the unscheduled work by one week’s share of the team’s free time (the four-week figure divided by four). Only work a person would do is counted: tasks assigned to an AI worker are left out, and unassigned tasks are kept in, since a person may yet take them. The line turns red when the answer is more than four weeks.

Choose someone under Person and the last figure becomes Their free time · 4 weeks, measured against that person alone.

What you see#

Every member can open All work. You see tasks in the projects you have access to, and work in archived projects is left out.